Serving NEPADrumsConynghamSugarloafHazletonMountain TopWhite Haven 4.5 on GoogleMon–Sat 8 AM – 7 PM
Full green lawn with a mulched island bed and a birch tree

Sod Installation.Serving Hazleton, PA and the surrounding areas

New sod installed right (a full, green lawn without the wait for seed to fill in), serving Drums, Hazleton and the surrounding Valley.

570-956-1027 Mon–Sat8 AM – 7 PM
Serving NEPA Locally Owned & Operated Own Equipment, No Subs

Get a Free Quote

What do you need?
4.5 on Google Free, no obligation

Got it, thanks.

Your request is in. Want to talk sooner? Call 570-956-1027.

A Full Lawn, Not A Waiting Game.

A bare or patchy yard, a new-construction lot with no lawn yet, or grass that didn't survive a bad season? Sod gives a full lawn right away instead of months of waiting on seed to fill in. The ground gets prepped and graded properly first, which is the step that actually decides whether it takes. That prep happens before a single roll goes down, every time.

Old lawn torn out with sod rolls ready to go down, Lombardo's Lawn Care, Drums PA
Old lawn out, sod rolls ready, in the Drums and Hazleton area

Signs It's Time To Call

  • Bare or dead patches are spread across the yard

    Patch sod can fix isolated spots without relaying the whole lawn.

  • New construction has no lawn yet

    A freshly built house is one of the most common reasons for a full sod install.

  • You're tired of reseeding the same spot every year

    If seed keeps failing in the same area, sod skips that cycle entirely.

  • You want a full lawn without the wait

    Sod is rooted and usable in weeks instead of the months seed takes to fill in.

Sod, Done Right.

Site Prep & Grading

Ground leveled and graded before sod goes down. That's the step that decides whether it actually takes.

Full Lawn Sod Installation

Entire yard laid at once for new construction or a full lawn replacement.

Patch Sod Repair

Matched sod for dead or bare patches instead of relaying an entire yard that's mostly fine.

New-Sod Watering Guidance

What the first few weeks need to actually root, walked through as part of every install.

Sod Service Questions.

How soon can I walk or mow on new sod?

Roots typically need 2 to 3 weeks before regular mowing or foot traffic. We'll give a specific timeline for your yard.

Do you prep the ground or just lay the sod?

Both. Prep and grading are what decide whether the sod actually takes.

Can you match sod to an existing lawn for a patch repair?

Yes, patch work is matched as closely as possible to the surrounding grass.

What time of year is best for sod?

Spring and early fall generally take best in this climate. We'll advise on timing when quoting.

Do you serve my area?

We're based in Drums and serve the Valley (Conyngham and Sugarloaf), Greater Hazleton, Mountaintop, White Haven and the rest of NEPA. Hours are Monday through Saturday, 8 AM to 7 PM.

What does sod installation cost?

It's priced by square footage and how much prep the site needs, so we don't quote it blind. Send a few details through the quote form or call 570-956-1027 for a real number.

Ready for a full lawn without the wait?

Send your address and what you need, and you'll hear back with a real quote, not a runaround.

Call Now Free Quote